Projects

#EMPLOYERDESCRIPTIONTYPECONCTRACT
DATE
PROVISIONAL
ACCEPTANCE
1KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF SEDİRLER STREETWORKS16.05.196915.09.1969
2KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF KONYA INDUSTRIAL PARKWORKS25.09.197027.08.1971
3KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF HACIKAYMAK AND ŞEKERMURAT DISTRICTSWORKS13.04.197127.07.1971
4KONYA MUNICIPALITYPUBLIC SEWERAGE CONSTRUCTIONWORKS20.05.19755.09.1975
5DIRECTORATE OF CONSTRUCTION WORKSCONSTRUCTION OF DERBENT COTTAGE HOSPITALWORKS12.11.197519.08.1977
6KONYA MUNICIPALITYOPEN TRUCK GARAGE CONSTRUCTIONWORKS11.06.197622.06.1977
7KONYA MUNICIPALITYCOVERING OF SEWERAGE LINEWORKS5.05.197813.10.1978
8KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF SEVERAL MAIN STREETSWORKS24.06.198028.01.1981
9KONYA MUNICIPALITYSEWERAGE CONSTRUCTION ON ANKARA ROADWORKS4.09.198029.06.1981
10KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF STREETS LOT 1WORKS4.05.198215.10.1982
11KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF SEVERAL MAIN STREETSWORKS4.05.198230.10.1982
12KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF STREETS LOT 2WORKS4.05.198230.10.1982
13STATE WATER WORKSIMPROVEMENT OF MERAM STREAM AND STONEWALL CONSTRUCTIONWORKS12.05.198221.10.1982
14KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF STREETS LOT 2WORKS4.04.198325.10.1983
15DIRECTORATE OF ROAD-WATER-ELECTRICITY WORKSSTONE EXTRACTION IN NİĞDEWORKS7.07.198310.11.1983
16DIRECTORATE OF ROAD-WATER-ELECTRICITY WORKSSTONE EXTRACTION IN KONYAWORKS7.07.198315.11.1983
17KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF STREETS LOT 1WORKS30.03.19846.08.1984
18PROVINCIAL DIRECTORATE OF RURAL SERVICESSTONE EXTRACTION AND FIGURATION IN EREĞLİWORKS13.07.198424.12.1984
19KONYA MUNICIPALITYAGGREGATE SUPPLY FOR ASPHALT PRODUCTIONSUPPLY13.07.19841.04.1985
20KONYA MUNICIPALITYAGGREGATE SUPPLY FOR ASPHALT PRODUCTIONSUPPLY3.04.198524.09.1985
21KONYA MUNICIPALITYSEWERAGE CONSTRUCTION OF STREETS LOT 7WORKS4.07.19852.12.1985
22KONYA MUNICIPALITYAGGREGATE SUPPLY FOR ASPHALT PRODUCTIONWORKS29.04.198611.11.1986
23KONYA METROPOLITAN MUNICIPALITYSEWERAGE CONSTRUCTION IN SLUM PREVENTION REGION #4WORKS28.05.198630.07.1987
24KONYA METROPOLITAN MUNICIPALITYSTONE EXTRACTION AT KARAÖMERLER QUARRYWORKS6.04.198815.05.1988
25KONYA METROPOLITAN MUNICIPALITYROAD INFRASTRUCTURE OF KONYA INDUSTRIAL PARK LOT 1WORKS15.06.198921.07.1990
26KONYA METROPOLITAN MUNICIPALITYROAD INFRASTRUCTURE OF KONYA INDUSTRIAL PARK LOT 2WORKS15.06.198921.07.1990
27PROVINCIAL DIRECTORATE OF RURAL SERVICESAGGREGATE SUPPLYWORKS3.07.198927.09.1989
28KONYA WATER WORKSSEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 1WORKS5.04.199012.06.1990
29KONYA WATER WORKSSEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 2WORKS19.04.199028.06.1990
30KONYA WATER WORKSSEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 3WORKS24.05.19905.09.1990
31KONYA WATER WORKSSEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 4WORKS16.08.199015.11.1990
32STATE WATER WORKSSPILLWAY CONSTRUCTION OF ÇAYHAN PONDWORKS7.12.199020.05.1991
33KONYA METROPOLITAN MUNICIPALITYSTONE EXTRACTION AT KARAÖMERLER QUARRY AND AGGREGATE PRODUCTIONWORKS24.04.199119.11.1991
34KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES22.05.199120.07.1991
35STATE WATER WORKSCLAY EMBANKMENT OF BULCUK PONDWORKS22.07.199128.11.1991
36STATE WATER WORKSIRRIGATION NETWORK OF GÜNEYYURT LOT 5WORKS4.09.19921.07.1993
37STATE WATER WORKSSPILLWAY CONSTRUCTION OF BULCUK PONDWORKS4.09.199216.02.1993
38KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KARATAT DISTRICT LOT 3WORKS15.04.199327.08.1993
39STATE WATER WORKSLAND RECULTIVATION AROUND LAKE TUZWORKS14.01.19949.12.1994
40KONYA WATER WORKSCONSTRUCTION OF HASANKÖY P3 PUMPING STATION, RESERVOIR AND TRANSFORMERWORKS2.05.199427.04.1996
41KONYA WATER WORKSSEWERAGE CONSTRUCTION OF KARATAY, MERAM, SELÇUKLU DISTRICTS LOT 4WORKS16.08.199416.05.1995
42KONYA WATER WORKSCONSTRUCTION OF BULGURLU PUMPING STATIONWORKS31.08.19949.05.1995
43KONYA WATER WORKSCONSTRUCTION OF ÇATALTEPE RESERVOIR 5000 m³WORKS5.05.199514.11.1996
44KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 4WORKS16.06.199526.12.1995
45KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 5WORKS8.04.199621.08.1996
46KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES27.06.199627.08.1996
47KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 9WORKS8.08.199613.12.1996
48KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 10WORKS8.08.199613.12.1996
49KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORT TO SLUM PREVENTION REGION #3SERVICES4.02.199721.05.1997
50KONYA METROPOLITAN MUNICIPALITYBASE MATERIAL AND AGGREGATE SUPPLY FCA KARAÖMERLER QUARRYWORKS24.04.199731.12.1997
51KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES9.06.199717.07.1997
52KONYA WATER WORKSCONSTRUCTION OF SİLLEKIRI RESERVOIR 25.000 m³WORKS19.06.19979.06.2003
53KONYA WATER WORKSCONSTRUCTION OF KARAGÜNEY RESERVOIR 2.000 m³WORKS19.06.199715.10.1998
54KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES24.07.199716.08.1997
55KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES29.08.199720.10.1997
56KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR KARATAY-KARAKAYA RURAL WAYSERVICES16.09.199722.10.1997
57KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES16.10.199721.11.1997
58KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR ALTINEKİN-KARAKAYA RURAL WAYSERVICES12.11.199727.11.1997
59KONYA METROPOLITAN MUNICIPALITYAGGREGATE TRANSPORTSERVICES20.11.199729.12.1997
60KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR ÇUMRA-KAŞINHANI RURAL WAYSERVICES15.12.199726.12.1997
61KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 14WORKS28.01.199830.06.1998
62KONYA METROPOLITAN MUNICIPALITYBASE MATERIAL AND AGGREGATE SUPPLY FCA KARAÖMERLER QUARRYWORKS19.03.199814.02.2000
63BURSA PROVINCIAL DIRECTORATE OF RURAL SERVICESAGGREGATE PRODUCTION AT BAŞKÖY QUARRYWORKS30.03.199830.07.1998
64KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 10WORKS22.07.19988.01.1999
65KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES19.10.199826.01.1999
66KONYA METROPOLITAN MUNICIPALITYBASE MATERIAL TRANSPORTSERVICES23.10.199830.12.1998
67KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES1.02.19998.04.1999
68KONYA METROPOLITAN MUNICIPALITYFILLER SUPPLY AND TRANSPORTSUPPLY18.02.199921.04.1999
69KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES15.04.19991.06.1999
70KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 1WORKS16.04.19999.08.1999
71KONYA WATER WORKSSTEEL AND PVC PIPE INSTALLATION OF ÇAYIRBAĞI FRESH WATER CONDUCTION LINEWORKS2.06.199915.02.2000
72KARATAY MUNICIPALITYAGREGATE TRANSPORTSERVICES1.07.199916.08.1999
73KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUMWORKS14.07.199924.02.2000
74KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES28.10.19996.12.1999
75KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES6.12.199930.12.1999
76KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY FOR COMPOUND HOT MIXWORKS20.01.200022.12.2000
77KONYA METROPOLITAN MUNICIPALITYREHABILITATION OF THE CITY LANDFILLWORKS2.02.200012.07.2000
78LAND FORCESSEWERAGE CONSTRUCTION OF STUDENT CLOTHING STORAGEWORKS7.04.200017.05.2000
79KONYA METROPOLITAN MUNICIPALITYREHABILITATION OF THE CITY LANDFILL LOT 2WORKS17.07.200024.08.2000
80KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 5WORKS2.08.200028.12.2000
81KONYA METROPOLITAN MUNICIPALITYTOPSOIL TRANSPORT FOR THE REHABILITATED PARTS OF CITY LANDFILLWORKS5.10.200029.06.2001
82KARATAY MUNICIPALITYAGGREGATE TRANSPORTSERVICES19.10.20003.12.2000
83KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY FOR COMPOUND HOT MIXWORKS22.11.200020.11.2001
84KAYSERİ WATER WORKSSEWERAGE CONSTRUCTION OF ARGINCIK-CENGIZ TOPEL-CAMII KEBIR-ESENTEPE DISTRICTSWORKS14.03.200127.12.2001
85KONYA METROPOLITAN MUNICIPALITYPAVEMENT DESIGN OF DR.HALIL ÜRÜN, BARIŞ STREETS AND MENDING OF VARIOUS STREETSWORKS3.05.20017.12.2001
86KONYA METROPOLITAN MUNICIPALITYMENDING OF VARIOUS STREETS IN KARATAY AND MERAM AND PAVEMENT DESIGNWORKS11.05.20013.12.2001
87KONYA WATER WORKSCONCRETE IRRIGATION CANAL CONSTRUCTION LOT 1WORKS11.05.200124.10.2001
88KONYA WATER WORKSSEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 1WORKS11.05.200117.09.2001
89KONYA WATER WORKSSTEEL AND PVC PIPE INSTALLATION ON WELL COLLECTION LINE #3WORKS8.03.200225.06.2002
90KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY FCA KARAÖMERLER QUARRYWORKS30.05.200215.12.2002
91KONYA WATER WORKSSTEEL AND PVC PIPE INSTALLATION AT VARIOUS DIAMETERSWORKS12.07.20024.12.2002
92KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF YAYLACIK RURAL ROADSWORKS29.07.200213.11.2002
93KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF BOYALI RURAL ROADSWORKS29.07.200230.10.2002
94KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF SADIKLAR RURAL ROADSWORKS1.08.200221.10.2002
95KONYA PROVINCIAL ADMINISTRATIONAGGREGATE AND BASE MATERIAL TRANSPORT AND WINDROWINGWORKS25.10.200222.01.2003
96KONYA WATER WORKSSTEEL AND PVC PIPE INSTALLATION AT VARIOUS DIAMETERSWORKS8.11.200229.12.2003
97DIRECTORATE OF KONYA INDUSTRIAL PARKLANDSLIDE MENDING OF RAINWATER COLLECTOR LINEWORKS26.11.200230.12.2002
98KONYA METROPOLITAN MUNICIPALITYREHABILITATION OF THE CITY LANDFILL LOT 3WORKS20.01.2003
99KONYA METROPOLITAN MUNICIPALITYAGGREGATE PRODUCTION ATKARAÖMERLER QUARRYSERVICES20.05.200323.12.2003
100SELÇUKLU MUNICIPALITYAGGREGATE TRANSPORTSERVICES22.07.20035.08.2003
101REGIONAL DIRECTORATE OF HIGHWAYSINTERCHANGE CONSTRUCTION ON ALTINEKİN-KONYA-HOTAMIŞ-EREĞLİ ROADSWORKS12.08.200323.12.2003
102KONYA PROVINCIAL ADMINISTRATIONAGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF GÖKYURT RURAL ROADSWORKS15.08.200314.11.2003
103KONYA METROPOLITAN MUNICIPALITYOPERATION OF ASLIM LANDFILLWORKS22.10.20033.07.2006
104KONYA METROPOLITAN MUNICIPALITYSOLID WASTE TRANSPORTSERVICES1.12.200326.02.2004
105KONYA METROPOLITAN MUNICIPALITYAGGREGATE PRODUCTION ATKARAÖMERLER QUARRYSERVICES4.03.20041.10.2004
106KONYA WATER WORKSSTEEL PIPE INSTALLATION ON MAIN CONDUCTION, COLLECTION AND DISTRIBUTION LINESWORKS6.05.20042.05.2005
107GAZNETCONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTUREWORKS28.05.200430.12.2004
108KONYA PROVINCIAL ADMINISTRATIONAGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF KAVAK RURAL ROADSUPPLY14.07.200427.07.2004
109KONYA WATER WORKSSEWERAGE CONSTRUCTIONWORKS16.08.200428.09.2004
110REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF KONYA-AKÖREN ROAD KM: 16+530 – 16+750 AND 18+100 – 19+580WORKS15.09.200414.12.2004
111KONYA METROPOLITAN MUNICIPALITYPAVEMENT DESIGN OF MAIN STREETSWORKS8.10.200427.10.2005
112KONYA PROVINCIAL ADMINISTRATIONBASE MATERIAL SUPPLY FOR VILLAGE ROADSSUPPLY12.10.200421.10.2004
113KONYA METROPOLITAN MUNICIPALITY550.000 m³ SOIL SUPPLYSUPPLY18.11.20043.01.2005
114GAZNETCONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTUREWORKS5.04.200529.12.2008
115KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY AND TRANSPORTWORKS20.04.200520.02.2006
116NETGAZCONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTUREWORKS7.05.200531.12.2005
117KONYA WATER WORKSAGGREGATE (0-19)mm AND FILLING MATERIAL (0-7)mm SUPPLYSUPPLY27.05.200515.09.2005
118KONYA METROPOLITAN MUNICIPALITYPAVEMENT DESIGN AND MENDING OF ELEMENTARY SCHOOLSWORKS12.08.200523.12.2005
119KONYA METROPOLITAN MUNICIPALITYPAVEMENT DESIGN AND MENDING IN SELÇUKLU DISTRICTWORKS25.08.20058.05.2006
120KONYA METROPOLITAN MUNICIPALITYPAVEMENT AND CYCLE LANE DESIGN ON KONYA RING ROADWORKS10.10.20059.10.2006
121REGIONAL DIRECTORATE OF HIGHWAYSINTERCHANGE CONSTRUCTION ON KONYA-KADINHANI-CİHANBEYLİ INTERSECTIONWORKS11.10.200522.11.2006
122REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF AKÖREN-BOZKIR ROAD KM: 5+900 – 26+710WORKS13.10.200531.12.2011
123KONYA PROVINCIAL ADMINISTRATIONAGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF ALTINEKIN KARAKAYA ROADWORKS15.12.200530.01.2006
124DIRECTORATE OF KONYA INDUSTRIAL PARKWATER CONDUCTION LINE AND MANHOLE CONSTRUCTIONWORKS2.01.200615.04.2006
125KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY AND TRANSPORTWORKS15.03.2006
126KAPADOKYA GAZCONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTUREWORKS11.04.200631.12.2006
127NETGAZCONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTUREWORKS12.04.200631.12.2006
128KONYA METROPOLITAN MUNICIPALITYWASTE STORAGE WORKS AT ASLIM LANDFILLWORKS19.04.20065.05.2008
129KONYA METROPOLITAN MUNICIPALITYDESIGN OF ALIYA IZZET BEGOVIÇ STREET AND FIRAT STREETWORKS11.05.200610.10.2006
130KONYA METROPOLITAN MUNICIPALITYASPHALT ROAD CONSTRUCTIONWORKS16.06.200631.12.2006
131KONYA WATER WORKSCONSTRUCTION OF DEDEKORKUT RESERVOIR 15.000 m³WORKS30.06.200618.12.2007
132KARATAY MUNICIPALITYFILLER AND AGGREGATE SUPPLYSUPPLY10.07.20069.11.2006
133KARAMAN GAZCONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTUREWORKS1.04.200731.12.2007
134KAPADOKYA GAZCONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTUREWORKS1.04.200731.12.2007
135KONYA METROPOLITAN MUNICIPALITYVARIOUS CONSTRUCTION WORKSWORKS16.04.200722.10.2007
136KONYA PROVINCIAL ADMINISTRATIONAGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP MERAMWORKS20.04.200722.05.2007
137SELÇUKLU MUNICIPALITYAGGREGATE AND BASE MATERIAL SUPPLYSUPPLY25.04.200717.11.2007
138KONYA PROVINCIAL ADMINISTRATIONAGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP SELÇUKLUWORKS25.04.200720.10.2007
139KONYA WATER WORKSIMPROVEMENT OF MERAM FLOOD PROTECTION CANALWORKS30.04.200724.10.2007
140KONYA PROVINCIAL ADMINISTRATIONAGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP ALTINEKİNWORKS16.05.20072.07.2007
141KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF LAMCI INTERCHANGE ON ÇAKIRLI STREETWORKS21.05.200727.12.2007
142KONYA PROVINCIAL ADMINISTRATIONAGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP AKÖRENWORKS21.05.20072.07.2007
143KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF KONYA FISH MARKETWORKS21.05.20079.05.2008
144KONYA METROPOLITAN MUNICIPALITYEXCAVATION, COVERING AND CONNECTION WORKS ON SEVERAL ROADSWORKS4.06.200731.12.2007
145KONYA METROPOLITAN MUNICIPALITYROAD DESIGN OF HACI CEMİL STREETWORKS4.06.200721.09.2007
146KARATAY MUNICIPALITYFILLER AND AGGREGATE SUPPLYSUPPLY8.06.200726.11.2007
147REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF KONYA-EREĞLİ ROAD KM: 14+600 – 20+960WORKS20.06.200723.10.2009
148KONYA WATER WORKSSTEEL PIPE SUPPLYSUPPLY6.08.200728.11.2007
149KONYA METROPOLITAN MUNICIPALITYINTERCHANGE CONSTRUCTION ON RING ROAD-KARAMAN ROAD INTERSECTIONWORKS7.08.200716.04.2008
150KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF OTOGAR INTERCHANGEWORKS22.10.200722.01.2008
151KARAMAN GAZCONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTUREWORKS3.03.200829.12.2008
152KAPADOKYA GAZCONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTUREWORKS3.03.200829.12.2008
153REGIONAL DIRECTORATE OF HIGHWAYSAGGREGATE AND BASE MATERIAL SUPPLY FOR KONYA-KARAPINAR ROADWORKS9.05.20085.07.2008
154KONYA METROPOLITAN MUNICIPALITYASPHALT ROAD AND PAVEMENT CONSTRUCTION LOT 2WORKS22.05.200823.11.2008
155KONYA METROPOLITAN MUNICIPALITYSCHOOLYARD DESIGN WORKSWORKS30.06.20083.07.2009
156KONYA METROPOLITAN MUNICIPALITYMEDICAL WASTE STERILIZATION PLANTBUILD
OPERATE
TRANSFER
22.07.200831.12.2017
157KONYA METROPOLITAN MUNICIPALITYWIDENING OF KONYA-ANKARA ROADWORKS20.08.20083.07.2009
158DIRECTORATE OF KONYA INDUSTRIAL PARKASPHALT WORKS OF MAIN STREETSWORKS29.08.20088.11.2008
159KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF BOSNA-HERSEK INTERCHANGEWORKS22.10.20083.07.2009
160REGIONAL DIRECTORATE OF HIGHWAYSAGGREGATE SUPPLY FOR CİHANBEYLİ AND ILGIN ROADSWORKS7.11.200813.12.2008
161REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF AKŞEHİR-AFYON ROAD KM: 131+000 – 146+200WORKS19.12.20088.10.2011
162KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY AND TRANSPORTSERVICES2.01.20098.04.2009
163REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF KONYA-AKŞEHİR ROAD KM: 102+000 – 124+000WORKS1.04.200912.12.2011
164KONYA METROPOLITAN MUNICIPALITY1ST SECTION BINDER ASPHALT AND BASE LAYER CONSTRUCTIONWORKS10.06.20093.11.2009
165KONYA PROVINCIAL ADMINISTRATIONCONSTRUCTION OF EREĞLİ-ULUKIŞLA ROAD KM: 160+320 – 179+667WORKS31.07.200924.09.2011
166KONYA METROPOLITAN MUNICIPALITYWASTE STORAGE WORKS AT ASLIM LANDFILL LOT 4WORKS3.08.200913.07.2011
167SELÇUK UNIVERSITYINFRASTRUCTURE OF THE CAMPUSWORKS18.09.200916.01.2011
168SELÇUKLU MUNICIPALITYASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2009WORKS19.02.20109.05.2012
169KONYA METROPOLITAN MUNICIPALITYOVERPASS CONSTRUCTIONWORKS20.05.20108.09.2010
170KONYA METROPOLITAN MUNICIPALITYASPHALT SUPPLY EX WORKSWORKS3.06.20102.10.2010
171KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF URBAN ROADS AND SIDEWALKSWORKS25.06.20101.12.2011
172DIRECTORATE OF KONYA INDUSTRIAL PARKASPHALT WORKS OF MAIN STREETSWORKS5.07.201023.10.2010
173KARATAY MUNICIPALITYCONRETE SUPPLYSUPPLY19.08.201015.12.2010
174REGIONAL DIRECTORATE OF HIGHWAYSAGGREGATE SUPPLY AND TRANSPORTWORKS13.12.201022.12.2010
175TEPEKÖY MUNICIPALITYFUEL, LPG AND MINERAL OIL SUPPLYSUPPLY27.12.201031.12.2011
176KONYA PROVINCIAL ADMINISTRATIONGRAVEL SUPPLY FOR VILLAGE ROADSWORKS29.12.201020.08.2011
177STATE WATER WORKSSTONEWALL CONSTRUCTION OF ALİÇAY STREAMWORKS4.01.201131.12.2011
178BAŞARAKAVAK MUNICIPALITYFUEL AND MINERAL OIL SUPPLYSUPPLY21.01.201131.12.2011
179DERBENT MUNICIPALITYFUEL SUPPLYSUPPLY8.02.201131.12.2011
180KARATAY MUNICIPALITYCEMENT SUPPLYSUPPLY9.03.201122.03.2011
181KARATAY MUNICIPALITYCONRETE SUPPLYSUPPLY9.03.201115.04.2011
182PROVINCIAL DIRECTORATE OF ENVIRONMENTFUEL SUPPLYSUPPLY16.03.201123.12.2011
183AKŞEHİR MUNICIPALITYFILLER SUPPLYSUPPLY17.03.201115.08.2011
184REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF KONYA-BEYŞEHİR ROAD KM: 11+900 – 18+300WORKS25.03.201130.07.2011
185ÇAY MUNICIPALITYAGGREGATE SUPPLYSUPPLY18.05.20119.09.2011
186TEPEKÖY MUNICIPALITYDIESEL SUPPLYSUPPLY27.05.201131.12.2011
187BAŞARAKAVAK MUNICIPALITYDIESEL SUPPLYSUPPLY28.05.201131.12.2011
188KONYA METROPOLITAN MUNICIPALITYASPHALT SUPPLY AND PAVEMENTWORKS2.06.201129.11.2011
189REGIONAL DIRECTORATE OF HIGHWAYSASPHALT PAVEMENT WORKS ON KONYA-EREĞLİ ROADWORKS3.06.201127.12.2011
190DERBENT MUNICIPALITYDIESEL SUPPLY 24.000 LITERSSUPPLY20.06.201131.12.2011
191KARATAY MUNICIPALITYASPHALT PAVEMENTWORKS8.07.201130.11.2011
192REGIONAL DIRECTORATE OF HIGHWAYSKONYA-AKSARAY ROAD KM: 13+000 – 72+000 ENGINEERING STRUCTURES AND EARTH WORKSWORKS1.08.201116.11.2013
193KONYA METROPOLITAN MUNICIPALITYRENOVATION OF KONYA RING ROADWORKS12.08.20116.12.2013
194KONYA METROPOLITAN MUNICIPALITYRENOVATION OF URBAN ROADSWORKS19.12.201117.10.2012
195BAŞARAKAVAK MUNICIPALITYFUEL, LPG AND MINERAL OIL SUPPLYSUPPLY22.12.201131.12.2012
196TEPEKÖY MUNICIPALITYFUEL, LPG AND MINERAL OIL SUPPLYSUPPLY23.12.201131.12.2012
197DERBENT MUNICIPALITYFUEL SUPPLYSUPPLY2.01.201231.12.2012
198REGIONAL DIRECTORATE OF HIGHWAYSASPHALT MENDING WORKS AGAINST WINTER CONDITIONSWORKS6.02.201220.03.2012
199SELÇUKLU MUNICIPALITYASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2011WORKS28.02.201219.09.2014
200REGIONAL DIRECTORATE OF HIGHWAYSASPHALT MENDING WORKS AGAINST WINTER CONDITIONSWORKS15.03.20122.05.2012
201KONYA METROPOLITAN MUNICIPALITYASPHALTIC CONCRETE SUPPLYWORKS24.04.201220.04.2013
202KONYA METROPOLITAN MUNICIPALITYHOT MIXTURE ASPHALT SUPPLY AND ROAD MENDINGWORKS18.05.20122.07.2013
203KARATAY MUNICIPALITYAGGRGATE, BASE MATERIAL AND FILLER SUPPLYSUPPLY24.05.201225.03.2013
204REGIONAL DIRECTORATE OF HIGHWAYSAGGREGATE SUPPLYSUPPLY29.06.201218.08.2012
205KONYA METROPOLITAN MUNICIPALITYSURFACE TREATMENT OF NEW ROADSWORKS13.07.201226.09.2013
206KARAPINAR MUNICIPALITYROAD CONSTRUCTIONWORKS3.09.201215.11.2012
207KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF BORSA INTERCHANGE ON KONYA-ADANA RING ROADWORKS28.09.20122.01.2013
208REGIONAL DIRECTORATE OF HIGHWAYSHOT MIXTURE ASPHALT PAVEMENT ON VARIOUS ROADSWORKS30.10.201222.07.2013
209REGIONAL DIRECTORATE OF HIGHWAYSSNOW SHOVELLING ON KONYA-SEYDİŞEHİR AND BEYŞEHİR ROADSSERVICES13.12.20124.04.2013
210TEPEKÖY MUNICIPALITYFUEL, LPG AND MINERAL OIL SUPPLYSUPPLY25.12.201231.12.2013
211BAŞARAKAVAK MUNICIPALITYFUEL SUPPLYSUPPLY25.12.201231.12.2013
212DERBENT MUNICIPALITYDIESEL SUPPLY 40.000 LITERSSUPPLY31.12.201231.12.2013
213PROVINCIAL DIRECTORATE OF ENVIRONMENTFUEL SUPPLYSUPPLY7.01.201331.12.2013
214KARATAY MUNICIPALITYCONCRETE SUPPLY 2013SUPPLY28.03.201327.12.2013
215ENERGAZCONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTURE 2013WORKS24.04.201331.12.2013
216ENERGAZCONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTURE 2013WORKS24.04.201315.11.2013
217ENERGAZCONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTURE 2013WORKS24.04.201331.03.2014
218KONYA METROPOLITAN MUNICIPALITYRENOVATION OF URBAN ROADS LOT 2WORKS8.05.20133.12.2013
219KONYA METROPOLITAN MUNICIPALITYRENOVATION OF URBAN ROADS LOT 1WORKS8.05.20133.12.2013
220KONYA METROPOLITAN MUNICIPALITYASPHALT SUPPLY AND PAVEMENT, ROAD RENOVATIONWORKS5.06.201327.12.2015
221ENERGAZCONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTURE 2013WORKS5.06.201331.12.2013
222ENERGAZCONSTRUCTION OF AKSARAY NATURAL GAS INFRASTRUCTURE 2013WORKS6.06.201331.12.2013
223KONYA METROPOLITAN MUNICIPALITYRENOVATION OF SELBASAN ROADWORKS4.07.20137.01.2014
224REGIONAL DIRECTORATE OF HIGHWAYSHOT MIXTURE ASPHALT PAVEMENT ON VARIOUS ROADS IN KONYA, BEYŞEHİR, SEYDİŞEHİR, AKSARAYWORKS15.07.201315.12.2013
225KONYA METROPOLITAN MUNICIPALITYINTERCHANGE CONSTRUCTION ON ÇEÇENİSTAN STREETWORKS29.08.201316.09.2015
226TEPEKÖY MUNICIPALITYFUEL AND LPG SUPPLYSUPPLY25.12.201331.03.2014
227DERBENT MUNICIPALITYDIESEL SUPPLY 66.000 LITERSSUPPLY31.12.201331.12.2014
228KONYA TAX OFFICEDIESEL SUPPLY 17.000 LITERSSUPPLY10.01.201431.12.2014
229BAŞARAKAVAK MUNICIPALITYFUEL SUPPLYSUPPLY16.01.201431.03.2014
230KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY FCA KARAÖMERLER QUARRYWORKS7.03.20147.10.2016
231KARATAY MUNICIPALITYCONCRETE SUPPLY 2014SUPPLY10.03.201430.12.2014
232REGIONAL DIRECTORATE OF HIGHWAYSKONYA-AKSARAY ROAD KM: 26+000 – 116+000 ENGINEERING STRUCTURES, EARTH AND ASPHALT WORKSWORKS4.04.201415.12.2016
233DIRECTORATE OF KONYA INDUSTRIAL PARKCONCRETE SUPPLY FOR EXTENSION AREA SURROUNDING WALLSUPPLY11.06.201421.12.2015
234KONYA METROPOLITAN MUNICIPALITYSTRUCTUAL STEEL AND CONCRETE SUPPLYSUPPLY7.08.20144.01.2015
235TEİAŞENVIRONMENTAL DESING, DRAINAGE AND ASPHALT PAVEMENT WORKSWORKS15.08.201426.09.2014
236KONYA ŞEKERCOAL STRIPPINGWORKS18.08.2014ONGOING
237KONYA METROPOLITAN MUNICIPALITYRENOVATION OF YENİ SİLLE STREETWORKS22.08.201410.06.2015
238SELÇUKLU MUNICIPALITYASPHALT AND BASE MATERIAL SUPPLY, TRANSPORT AND APPLICATIONWORKS14.10.201424.11.2014
239KONYA METROPOLITAN MUNICIPALITYASPHALT SUPPLY EX WORKSWORKS21.11.201429.05.2015
240SELÇUKLU MUNICIPALITYASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2014WORKS21.11.20143.01.2018
241KONYA METROPOLITAN MUNICIPALITYCONCRETE AND PORTLAND CEMENT SUPPLYSUPPLY5.12.201415.12.2017
242KONYA TAX OFFICEFUEL SUPPLYSUPPLY19.12.201431.12.2015
243KONYA METROPOLITAN MUNICIPALITYRENOVATION OF GÜNEYSINIR MAIN STREETWORKS29.12.201429.06.2016
244KONYA METROPOLITAN MUNICIPALITYRENOVATION OF EMİRGAZİ MAIN STREETWORKS5.01.201522.12.2015
245KONYA METROPOLITAN MUNICIPALITYRENOVATION OF DERBENT MAIN STREETWORKS5.01.201524.06.2016
246KONYA METROPOLITAN MUNICIPALITYRENOVATION OF ÇUMRA MAIN STREETWORKS5.01.20155.10.2016
247KONYA METROPOLITAN MUNICIPALITYCONCRETE ELEMENTS AND BASE MATERIAL SUPPLYSUPPLY5.01.20151.12.2016
248DERBENT MUNICIPALITYDIESEL SUPPLY 55.000 LITERSSUPPLY15.01.20155.01.2016
249KONYA METROPOLITAN MUNICIPALITYWASTE STORAGE WORKS AT ASLIM LANDFILL LOT 7WORKS20.03.201522.03.2016
250KARATAY MUNICIPALITYCONCRETE SUPPLY 2015SUPPLY6.05.201530.12.2015
251AIR DEFENCE COMMANDASPHALT PATCH WORKSWORKS4.06.20153.07.2015
252KONYA METROPOLITAN MUNICIPALITYSTRUCTUAL STEEL AND CONCRETE SUPPLYSUPPLY23.06.201523.07.2017
253KONYA METROPOLITAN MUNICIPALITYREINFORCED CONCRETE WORKS IN EMİRGAZİ, DERBENT AND GÜNEYSINIR DISTRICTSWORKS31.07.20157.12.2015
254KONYA METROPOLITAN MUNICIPALITYRENOVATION OF URBAN ROADSWORKS31.07.201520.07.2018
255KARATAY MUNICIPALITYDRAINAGE PIPELINE INSTALLATION ON KANAL STREETWORKS28.09.201520.01.2016
256KONYA METROPOLITAN MUNICIPALITYSTRUCTUAL STEEL AND CONCRETE SUPPLY, TRANSPORT AND PLACINGSUPPLY13.10.201516.09.2018
257DERBENT MUNICIPALITYFUEL SUPPLYSUPPLY15.01.201631.12.2016
258KARATAY MUNICIPALITYCONCRETE SUPPLY 2016SUPPLY6.04.201619.12.2016
259KONYA WATER WORKSCONSTRUCTION OF WATER RESEVOIRS 2016 LOT 1WORKS6.04.201623.04.2017
260SELÇUKLU MUNICIPALITYCONCRETE SUPPLYSUPPLY22.04.201622.12.2016
261KONYA METROPOLITAN MUNICIPALITYASPHALT SUPPLY EX WORKSWORKS22.04.201619.09.2017
262KARATAY MUNICIPALITYASPHALT PATCH WORKSSERVICES28.04.201617.11.2016
263MERAM MUNICIPALITYAGGREGATE AND FILLER SUPPLY AND TRANSPORTSUPPLY5.05.20169.09.2016
264KONYA WATER WORKSSUBBASE MATERIAL AND FILLER SUPPLYSUPPLY24.05.201623.08.2016
265KONYA METROPOLITAN MUNICIPALITYAKŞEHİR LANDFILL GAS POWER PLANTBUILD
OPERATE
TRANSFER
13.06.2016ONGOING
266KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF WASTE SORTING PLANTWORKS19.09.20163.01.2018
267REGIONAL DIRECTORATE OF HIGHWAYSCONSTRUCTION OF SEYDİŞEHİR-BOZKIR ROAD KM: 0+000 – 6+000WORKS19.09.201630.09.2017
268KONYA METROPOLITAN MUNICIPALITYCONSTRUCION OF MERAM UNDERGROUND PARKING GARAGEWORKS24.10.20165.11.2019
269ERZURUM METROPOLITAN MUNICIPALITYERZURUM LANDFILL GAS POWER PLANTBUILD
OPERATE
TRANSFER
27.10.2016ONGOING
270KONYA METROPOLITAN MUNICIPALITYAGGREGATE SUPPLY FCA KARAÖMERLER QUARRYWORKS28.11.201623.11.2018
271KONYA TAX OFFICEFUEL SUPPLYSUPPLY7.12.20167.12.2017
272SELÇUKLU MUNICIPALITYCONCRETE SUPPLYSUPPLY16.12.201627.01.2017
273AKŞEHİR MUNICIPALITYCONSTRUCTION OF DUDU KADIN BAZAARWORKS21.12.201616.10.2019
274DERBENT MUNICIPALITYFUEL SUPPLYSUPPLY30.12.201630.12.2017
275KONYA METROPOLITAN MUNICIPALITYKONYA WASTE TO ENERGY PLANTBUILD
OPERATE
TRANSFER
1.02.2017ONGOING
276KONYA METROPOLITAN MUNICIPALITYROAD AND PAVEMENT CONSTRUCTIONWORKS17.02.201712.04.2018
277MERAM MUNICIPALITYASPHALT PRODUCTION AND PAVEMENT WORKSWORKS10.04.201727.06.2019
278MERAM MUNICIPALITYCONCRETE SUPPLYSUPPLY17.04.201711.02.2018
279AKSARAY MUNICIPALITYATATÜRK BULVARI EFOR AVM FRONT BRIDGE INTERCHANGE CONSTRUCTION WORKWORKS24.05.20172.05.2018
280MERAM MUNICIPALITYWASHED SURFACE COATING GROUND, 0-5 MM FILLER MATERIAL SUPPLY AND TRANSPORTSUPPLY26.05.20179.10.2017
281KONYA METROPOLITAN MUNICIPALITYMAKING AESTHETIC ARRANGEMENTS ON STREETS AND SQUAREWORKS11.10.201715.10.2019
282KONYA METROPOLITAN MUNICIPALITYCOATING ON CITY ROADSWORKS15.11.20175.11.2017
283KONYA TAX OFFICELIQUID FUELSUPPLY5.12.201731.12.2018
284DIRECTORATE OF KONYA INDUSTRIAL PARKKONYA ORGANIZED INDUSTRIAL ZONE 5TH PART EXPANSION AREA WASTEWATER NETWORK, STORM WATER NETWORK AND ROAD INFRASTRUCTURE WORKSWORKS6.12.201730.12.2020
285DERBENT MUNICIPALITYPURCHASE OF FUEL GOODSSUPPLY29.12.201731.12.2018
286KONYA METROPOLITAN MUNICIPALITYARRANGEMENT OF KONYA CITY ROADSWORKS29.12.201717.10.2022
287KONYA TAX OFFICELIQUID FUEL SUPPLYSUPPLY28.11.201831.12.2019
288DIRECTORATE OF KONYA INDUSTRIAL PARKRAINWATER DISCHARGE CHANNEL CONSTRUCTION WORKWORKS12.09.201912.10.2020
289DIRECTORATE OF KONYA INDUSTRIAL PARKWASTEWATER AND RAINWATER PUMPING CENTER CONSTRUCTION WORK FOR PART 2, 3 AND 4WORKS24.10.20194.07.2022
290DERBENT MUNICIPALITYLIQUID FUEL SUPPLYSUPPLY20.11.201931.12.2020
291ASELSAN KONYA WEAPON SYSTEMS INC.ASELSAN KONYA EXCAVATION, FILLING, INFRASTRUCTURE AND LANDSCAPING WORKSWORKS17.12.201920.05.2021
292MERAM MUNICIPALITYCRUSHED STONE SUPPLYSUPPLY15.04.202022.12.2020
293DIRECTORATE OF KONYA INDUSTRIAL PARKPART 5 NATURAL GAS INFRASTRUCTURE WORKWORKS27.07.202014.08.2021
294KARATAY MUNICIPALITYLAYING AND COMPRESSION OF HOT ASPHALT MATERIALSERVICES12.08.202010.11.2020
295DERBENT MUNICIPALITYPURCHASE OF FUEL GOODSSUPPLY20.10.202031.12.2021
296KONYA METROPOLITAN MUNICIPALITYURBAN RENOVATION PROJECT IN FRONT OF THE TURBEWORKS15.12.20205.08.2022
297MINISTRY OF YOUTH AND SPORTSKONYA VELEDROM CONSTRUCTION WORKWORKS14.01.20211.07.2022
298DERBENT MUNICIPALITYFUEL AND GOODS SUPPLYSUPPLY8.12.202131.12.2022
299MERAM MUNICIPALITY0-25 MM AGGREGATE SUPPLY AND TRANSPORTSUPPLY30.03.202219.12.2022
300DIRECTORATE OF KONYA INDUSTRIAL PARK5. PART NO. 2 PUMPING CENTER SUPPLY CONSTRUCTION WORKWORKS6.07.2022ONGOING
301MERAM MUNICIPALITYMERAM YAKA SOCIAL FACILITY CONSTRUCTIONWORKS7.07.2022ONGOING
302KONYA METROPOLITAN MUNICIPALITYCONCRETE SUPPLYSUPPLY17.08.202215.12.2022
303KONYA METROPOLITAN MUNICIPALITYKÜÇÜKKOVANAGZI TAŞKÖPRÜ AVENUE BRIDGE INTERCHANGE CONSTRUCTIONWORKS10.02.2023ONGOING
304KONYA METROPOLITAN MUNICIPALITYCONSTRUCTION OF SEDIRLER BRIDGE INTERCHANGEWORKS17.02.2023ONGOING