Meram Yaka Social Facility
Employer: Meram MunicipalityContract Date: 7.07.2022Finish Date: OngoingSedirler Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 17.02.2023Finish Date: OngoingTaşköprü Street Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 10.02.2023Finish Date: OngoingKonya Velodrome
Employer: Ministry Of Youth And SportsContract Date: 14.01.2021Finish Date: 1.07.2022Urban Renewal in front of Mevlana Tomb
Employer: Konya Metropolitan MunicipalityContract Date: 15.12.2020Finish Date: 5.08.2022Aselsan Konya Infrastructure
Employer: Aselsan Konya Weapon Systems Inc.Contract Date: 17.12.2019Finish Date: 20.05.2021Konya 5th Organized Industrial Zone Infrastructure
Employer: Directorate Of Konya Industrial ParkContract Date: 6.12.2017Finish Date: 30.12.2020Piri Mehmet Pasha Underpass
Employer: Aksaray MunicipalityContract Date: 24.05.2017Finish Date: 2.05.2018Dudu Kadın Bazaar
Employer: Akşehir MunicipalityContract Date: 21.12.2016Finish Date: 16.10.2019Çeçenistan Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 29.08.2013Finish Date: 16.09.2015Konya Natural Gas Infrastructure 2013
Employer: Energaz Gaz Su Elektrik Dağıtım A.Ş.Contract Date: 10.06.2013Finish Date: 31.12.2013Karaman Natural Gas Infrastructure
Employer: Energaz Gaz Su Elektrik Dağıtım A.Ş.Contract Date: 01.06.2013Finish Date: 31.12.2013Nevşehir Natural Gas Infrastructure
Employer: Energaz Gaz Su Elektrik Dağıtım A.Ş.Contract Date: 05.06.2013Finish Date: 31.12.2013Borsa Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 05.10.2012Finish Date: 03.06.2013Konya Ringroad Renovation
Employer: Konya Metropolitan MunicipalityContract Date: 12.08.2011Finish Date: 01.03.2013Konya-Aksaray Road 13-72
Employer: Regional Directorate of HighwaysContract Date: 08.08.2011Finish Date: 16.11.2013Konya-Ereğli Road
Employer: Regional Directorate of HighwaysContract Date: 03.06.2011Finish Date: 27.04.2012Konya-Beyşehir Road
Employer: Regional Directorate of HighwaysContract Date: 01.04.2011Finish Date: 01.08.2011Urban Roads and Pavements
Employer: Konya Metropolitan MunicipalityContract Date: 25.06.2010Finish Date: 01.12.2011Selçuklu Asphalt Works
Employer: Selçuklu MunicipalityContract Date: 19.02.2010Finish Date: 09.05.2012SÜ Campus Infrastructure
Employer: Selçuk UniversityContract Date: 23.09.2009Finish Date: 16.01.2011Konya-Akşehir Road
Employer: Regional Directorate of HighwaysContract Date: 01.04.2009Finish Date: 12.12.2011Akşehir-Afyon Road
Employer: Regional Directorate of HighwaysContract Date: 23.12.2008Finish Date: 01.12.2011Bosna Hersek Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 22.10.2008Finish Date: 03.07.2009Widening of Ankara Road
Employer: Konya Metropolitan MunicipalityContract Date: 06.10.2008Finish Date: 27.06.2009Karaman Road Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 07.08.2007Finish Date: 16.04.2008Konya Fish Market
Employer: Konya Metropolitan MunicipalityContract Date: 21.05.2007Finish Date: 09.05.2008Lamcı Interchange
Employer: Konya Metropolitan MunicipalityContract Date: 21.05.2007Finish Date: 27.12.2007Dedekorkut Water Reservoir
Employer: Koski (Konya Water Works)Contract Date: 04.07.2006Finish Date: 23.11.2007Aslım Solid Waste Storage
Employer: Konya Metropolitan MunicipalityContract Date: 19.04.2006Finish Date: 05.05.20082. Organize Interchange
Employer: Regional Directorate of HighwayscompContract Date: 11.10.2005Finish Date: 22.11.2006Konya-Akören Road
Employer: Regional Directorate of HighwaysContract Date: 18.08.2005Finish Date: N/AKonya Natural Gas Infrastructure
Employer: Gaznet Şehir Doğal Gaz Dağıtım A.Ş.Contract Date: 28.05.2004Finish Date: 29.12.2008
| # | EMPLOYER | DESCRIPTION | TYPE | CONCTRACT DATE | PROVISIONAL ACCEPTANCE |
|---|---|---|---|---|---|
| 1 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF SEDİRLER STREET | WORKS | 16.05.1969 | 15.09.1969 |
| 2 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF KONYA INDUSTRIAL PARK | WORKS | 25.09.1970 | 27.08.1971 |
| 3 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF HACIKAYMAK AND ŞEKERMURAT DISTRICTS | WORKS | 13.04.1971 | 27.07.1971 |
| 4 | KONYA MUNICIPALITY | PUBLIC SEWERAGE CONSTRUCTION | WORKS | 20.05.1975 | 5.09.1975 |
| 5 | DIRECTORATE OF CONSTRUCTION WORKS | CONSTRUCTION OF DERBENT COTTAGE HOSPITAL | WORKS | 12.11.1975 | 19.08.1977 |
| 6 | KONYA MUNICIPALITY | OPEN TRUCK GARAGE CONSTRUCTION | WORKS | 11.06.1976 | 22.06.1977 |
| 7 | KONYA MUNICIPALITY | COVERING OF SEWERAGE LINE | WORKS | 5.05.1978 | 13.10.1978 |
| 8 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF SEVERAL MAIN STREETS | WORKS | 24.06.1980 | 28.01.1981 |
| 9 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION ON ANKARA ROAD | WORKS | 4.09.1980 | 29.06.1981 |
| 10 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF STREETS LOT 1 | WORKS | 4.05.1982 | 15.10.1982 |
| 11 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF SEVERAL MAIN STREETS | WORKS | 4.05.1982 | 30.10.1982 |
| 12 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF STREETS LOT 2 | WORKS | 4.05.1982 | 30.10.1982 |
| 13 | STATE WATER WORKS | IMPROVEMENT OF MERAM STREAM AND STONEWALL CONSTRUCTION | WORKS | 12.05.1982 | 21.10.1982 |
| 14 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF STREETS LOT 2 | WORKS | 4.04.1983 | 25.10.1983 |
| 15 | DIRECTORATE OF ROAD-WATER-ELECTRICITY WORKS | STONE EXTRACTION IN NİĞDE | WORKS | 7.07.1983 | 10.11.1983 |
| 16 | DIRECTORATE OF ROAD-WATER-ELECTRICITY WORKS | STONE EXTRACTION IN KONYA | WORKS | 7.07.1983 | 15.11.1983 |
| 17 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF STREETS LOT 1 | WORKS | 30.03.1984 | 6.08.1984 |
| 18 | PROVINCIAL DIRECTORATE OF RURAL SERVICES | STONE EXTRACTION AND FIGURATION IN EREĞLİ | WORKS | 13.07.1984 | 24.12.1984 |
| 19 | KONYA MUNICIPALITY | AGGREGATE SUPPLY FOR ASPHALT PRODUCTION | SUPPLY | 13.07.1984 | 1.04.1985 |
| 20 | KONYA MUNICIPALITY | AGGREGATE SUPPLY FOR ASPHALT PRODUCTION | SUPPLY | 3.04.1985 | 24.09.1985 |
| 21 | KONYA MUNICIPALITY | SEWERAGE CONSTRUCTION OF STREETS LOT 7 | WORKS | 4.07.1985 | 2.12.1985 |
| 22 | KONYA MUNICIPALITY | AGGREGATE SUPPLY FOR ASPHALT PRODUCTION | WORKS | 29.04.1986 | 11.11.1986 |
| 23 | KONYA METROPOLITAN MUNICIPALITY | SEWERAGE CONSTRUCTION IN SLUM PREVENTION REGION #4 | WORKS | 28.05.1986 | 30.07.1987 |
| 24 | KONYA METROPOLITAN MUNICIPALITY | STONE EXTRACTION AT KARAÖMERLER QUARRY | WORKS | 6.04.1988 | 15.05.1988 |
| 25 | KONYA METROPOLITAN MUNICIPALITY | ROAD INFRASTRUCTURE OF KONYA INDUSTRIAL PARK LOT 1 | WORKS | 15.06.1989 | 21.07.1990 |
| 26 | KONYA METROPOLITAN MUNICIPALITY | ROAD INFRASTRUCTURE OF KONYA INDUSTRIAL PARK LOT 2 | WORKS | 15.06.1989 | 21.07.1990 |
| 27 | PROVINCIAL DIRECTORATE OF RURAL SERVICES | AGGREGATE SUPPLY | WORKS | 3.07.1989 | 27.09.1989 |
| 28 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 1 | WORKS | 5.04.1990 | 12.06.1990 |
| 29 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 2 | WORKS | 19.04.1990 | 28.06.1990 |
| 30 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 3 | WORKS | 24.05.1990 | 5.09.1990 |
| 31 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN MERAM DISTRICT LOT 4 | WORKS | 16.08.1990 | 15.11.1990 |
| 32 | STATE WATER WORKS | SPILLWAY CONSTRUCTION OF ÇAYHAN POND | WORKS | 7.12.1990 | 20.05.1991 |
| 33 | KONYA METROPOLITAN MUNICIPALITY | STONE EXTRACTION AT KARAÖMERLER QUARRY AND AGGREGATE PRODUCTION | WORKS | 24.04.1991 | 19.11.1991 |
| 34 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 22.05.1991 | 20.07.1991 |
| 35 | STATE WATER WORKS | CLAY EMBANKMENT OF BULCUK POND | WORKS | 22.07.1991 | 28.11.1991 |
| 36 | STATE WATER WORKS | IRRIGATION NETWORK OF GÜNEYYURT LOT 5 | WORKS | 4.09.1992 | 1.07.1993 |
| 37 | STATE WATER WORKS | SPILLWAY CONSTRUCTION OF BULCUK POND | WORKS | 4.09.1992 | 16.02.1993 |
| 38 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KARATAT DISTRICT LOT 3 | WORKS | 15.04.1993 | 27.08.1993 |
| 39 | STATE WATER WORKS | LAND RECULTIVATION AROUND LAKE TUZ | WORKS | 14.01.1994 | 9.12.1994 |
| 40 | KONYA WATER WORKS | CONSTRUCTION OF HASANKÖY P3 PUMPING STATION, RESERVOIR AND TRANSFORMER | WORKS | 2.05.1994 | 27.04.1996 |
| 41 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION OF KARATAY, MERAM, SELÇUKLU DISTRICTS LOT 4 | WORKS | 16.08.1994 | 16.05.1995 |
| 42 | KONYA WATER WORKS | CONSTRUCTION OF BULGURLU PUMPING STATION | WORKS | 31.08.1994 | 9.05.1995 |
| 43 | KONYA WATER WORKS | CONSTRUCTION OF ÇATALTEPE RESERVOIR 5000 m³ | WORKS | 5.05.1995 | 14.11.1996 |
| 44 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 4 | WORKS | 16.06.1995 | 26.12.1995 |
| 45 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 5 | WORKS | 8.04.1996 | 21.08.1996 |
| 46 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 27.06.1996 | 27.08.1996 |
| 47 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 9 | WORKS | 8.08.1996 | 13.12.1996 |
| 48 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 10 | WORKS | 8.08.1996 | 13.12.1996 |
| 49 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT TO SLUM PREVENTION REGION #3 | SERVICES | 4.02.1997 | 21.05.1997 |
| 50 | KONYA METROPOLITAN MUNICIPALITY | BASE MATERIAL AND AGGREGATE SUPPLY FCA KARAÖMERLER QUARRY | WORKS | 24.04.1997 | 31.12.1997 |
| 51 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 9.06.1997 | 17.07.1997 |
| 52 | KONYA WATER WORKS | CONSTRUCTION OF SİLLEKIRI RESERVOIR 25.000 m³ | WORKS | 19.06.1997 | 9.06.2003 |
| 53 | KONYA WATER WORKS | CONSTRUCTION OF KARAGÜNEY RESERVOIR 2.000 m³ | WORKS | 19.06.1997 | 15.10.1998 |
| 54 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 24.07.1997 | 16.08.1997 |
| 55 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 29.08.1997 | 20.10.1997 |
| 56 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR KARATAY-KARAKAYA RURAL WAY | SERVICES | 16.09.1997 | 22.10.1997 |
| 57 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 16.10.1997 | 21.11.1997 |
| 58 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR ALTINEKİN-KARAKAYA RURAL WAY | SERVICES | 12.11.1997 | 27.11.1997 |
| 59 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 20.11.1997 | 29.12.1997 |
| 60 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY AND TRANSPORT FOR ÇUMRA-KAŞINHANI RURAL WAY | SERVICES | 15.12.1997 | 26.12.1997 |
| 61 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 14 | WORKS | 28.01.1998 | 30.06.1998 |
| 62 | KONYA METROPOLITAN MUNICIPALITY | BASE MATERIAL AND AGGREGATE SUPPLY FCA KARAÖMERLER QUARRY | WORKS | 19.03.1998 | 14.02.2000 |
| 63 | BURSA PROVINCIAL DIRECTORATE OF RURAL SERVICES | AGGREGATE PRODUCTION AT BAŞKÖY QUARRY | WORKS | 30.03.1998 | 30.07.1998 |
| 64 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 10 | WORKS | 22.07.1998 | 8.01.1999 |
| 65 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 19.10.1998 | 26.01.1999 |
| 66 | KONYA METROPOLITAN MUNICIPALITY | BASE MATERIAL TRANSPORT | SERVICES | 23.10.1998 | 30.12.1998 |
| 67 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 1.02.1999 | 8.04.1999 |
| 68 | KONYA METROPOLITAN MUNICIPALITY | FILLER SUPPLY AND TRANSPORT | SUPPLY | 18.02.1999 | 21.04.1999 |
| 69 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 15.04.1999 | 1.06.1999 |
| 70 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 1 | WORKS | 16.04.1999 | 9.08.1999 |
| 71 | KONYA WATER WORKS | STEEL AND PVC PIPE INSTALLATION OF ÇAYIRBAĞI FRESH WATER CONDUCTION LINE | WORKS | 2.06.1999 | 15.02.2000 |
| 72 | KARATAY MUNICIPALITY | AGREGATE TRANSPORT | SERVICES | 1.07.1999 | 16.08.1999 |
| 73 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM | WORKS | 14.07.1999 | 24.02.2000 |
| 74 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 28.10.1999 | 6.12.1999 |
| 75 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 6.12.1999 | 30.12.1999 |
| 76 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY FOR COMPOUND HOT MIX | WORKS | 20.01.2000 | 22.12.2000 |
| 77 | KONYA METROPOLITAN MUNICIPALITY | REHABILITATION OF THE CITY LANDFILL | WORKS | 2.02.2000 | 12.07.2000 |
| 78 | LAND FORCES | SEWERAGE CONSTRUCTION OF STUDENT CLOTHING STORAGE | WORKS | 7.04.2000 | 17.05.2000 |
| 79 | KONYA METROPOLITAN MUNICIPALITY | REHABILITATION OF THE CITY LANDFILL LOT 2 | WORKS | 17.07.2000 | 24.08.2000 |
| 80 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 5 | WORKS | 2.08.2000 | 28.12.2000 |
| 81 | KONYA METROPOLITAN MUNICIPALITY | TOPSOIL TRANSPORT FOR THE REHABILITATED PARTS OF CITY LANDFILL | WORKS | 5.10.2000 | 29.06.2001 |
| 82 | KARATAY MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 19.10.2000 | 3.12.2000 |
| 83 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY FOR COMPOUND HOT MIX | WORKS | 22.11.2000 | 20.11.2001 |
| 84 | KAYSERİ WATER WORKS | SEWERAGE CONSTRUCTION OF ARGINCIK-CENGIZ TOPEL-CAMII KEBIR-ESENTEPE DISTRICTS | WORKS | 14.03.2001 | 27.12.2001 |
| 85 | KONYA METROPOLITAN MUNICIPALITY | PAVEMENT DESIGN OF DR.HALIL ÜRÜN, BARIŞ STREETS AND MENDING OF VARIOUS STREETS | WORKS | 3.05.2001 | 7.12.2001 |
| 86 | KONYA METROPOLITAN MUNICIPALITY | MENDING OF VARIOUS STREETS IN KARATAY AND MERAM AND PAVEMENT DESIGN | WORKS | 11.05.2001 | 3.12.2001 |
| 87 | KONYA WATER WORKS | CONCRETE IRRIGATION CANAL CONSTRUCTION LOT 1 | WORKS | 11.05.2001 | 24.10.2001 |
| 88 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION IN KONYA CENTRUM LOT 1 | WORKS | 11.05.2001 | 17.09.2001 |
| 89 | KONYA WATER WORKS | STEEL AND PVC PIPE INSTALLATION ON WELL COLLECTION LINE #3 | WORKS | 8.03.2002 | 25.06.2002 |
| 90 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY FCA KARAÖMERLER QUARRY | WORKS | 30.05.2002 | 15.12.2002 |
| 91 | KONYA WATER WORKS | STEEL AND PVC PIPE INSTALLATION AT VARIOUS DIAMETERS | WORKS | 12.07.2002 | 4.12.2002 |
| 92 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF YAYLACIK RURAL ROADS | WORKS | 29.07.2002 | 13.11.2002 |
| 93 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF BOYALI RURAL ROADS | WORKS | 29.07.2002 | 30.10.2002 |
| 94 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL SUPPLY FOR ASPHALT COVERING OF SADIKLAR RURAL ROADS | WORKS | 1.08.2002 | 21.10.2002 |
| 95 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE AND BASE MATERIAL TRANSPORT AND WINDROWING | WORKS | 25.10.2002 | 22.01.2003 |
| 96 | KONYA WATER WORKS | STEEL AND PVC PIPE INSTALLATION AT VARIOUS DIAMETERS | WORKS | 8.11.2002 | 29.12.2003 |
| 97 | DIRECTORATE OF KONYA INDUSTRIAL PARK | LANDSLIDE MENDING OF RAINWATER COLLECTOR LINE | WORKS | 26.11.2002 | 30.12.2002 |
| 98 | KONYA METROPOLITAN MUNICIPALITY | REHABILITATION OF THE CITY LANDFILL LOT 3 | WORKS | 20.01.2003 | |
| 99 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE PRODUCTION ATKARAÖMERLER QUARRY | SERVICES | 20.05.2003 | 23.12.2003 |
| 100 | SELÇUKLU MUNICIPALITY | AGGREGATE TRANSPORT | SERVICES | 22.07.2003 | 5.08.2003 |
| 101 | REGIONAL DIRECTORATE OF HIGHWAYS | INTERCHANGE CONSTRUCTION ON ALTINEKİN-KONYA-HOTAMIŞ-EREĞLİ ROADS | WORKS | 12.08.2003 | 23.12.2003 |
| 102 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF GÖKYURT RURAL ROADS | WORKS | 15.08.2003 | 14.11.2003 |
| 103 | KONYA METROPOLITAN MUNICIPALITY | OPERATION OF ASLIM LANDFILL | WORKS | 22.10.2003 | 3.07.2006 |
| 104 | KONYA METROPOLITAN MUNICIPALITY | SOLID WASTE TRANSPORT | SERVICES | 1.12.2003 | 26.02.2004 |
| 105 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE PRODUCTION ATKARAÖMERLER QUARRY | SERVICES | 4.03.2004 | 1.10.2004 |
| 106 | KONYA WATER WORKS | STEEL PIPE INSTALLATION ON MAIN CONDUCTION, COLLECTION AND DISTRIBUTION LINES | WORKS | 6.05.2004 | 2.05.2005 |
| 107 | GAZNET | CONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTURE | WORKS | 28.05.2004 | 30.12.2004 |
| 108 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF KAVAK RURAL ROAD | SUPPLY | 14.07.2004 | 27.07.2004 |
| 109 | KONYA WATER WORKS | SEWERAGE CONSTRUCTION | WORKS | 16.08.2004 | 28.09.2004 |
| 110 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF KONYA-AKÖREN ROAD KM: 16+530 – 16+750 AND 18+100 – 19+580 | WORKS | 15.09.2004 | 14.12.2004 |
| 111 | KONYA METROPOLITAN MUNICIPALITY | PAVEMENT DESIGN OF MAIN STREETS | WORKS | 8.10.2004 | 27.10.2005 |
| 112 | KONYA PROVINCIAL ADMINISTRATION | BASE MATERIAL SUPPLY FOR VILLAGE ROADS | SUPPLY | 12.10.2004 | 21.10.2004 |
| 113 | KONYA METROPOLITAN MUNICIPALITY | 550.000 m³ SOIL SUPPLY | SUPPLY | 18.11.2004 | 3.01.2005 |
| 114 | GAZNET | CONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTURE | WORKS | 5.04.2005 | 29.12.2008 |
| 115 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY AND TRANSPORT | WORKS | 20.04.2005 | 20.02.2006 |
| 116 | NETGAZ | CONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTURE | WORKS | 7.05.2005 | 31.12.2005 |
| 117 | KONYA WATER WORKS | AGGREGATE (0-19)mm AND FILLING MATERIAL (0-7)mm SUPPLY | SUPPLY | 27.05.2005 | 15.09.2005 |
| 118 | KONYA METROPOLITAN MUNICIPALITY | PAVEMENT DESIGN AND MENDING OF ELEMENTARY SCHOOLS | WORKS | 12.08.2005 | 23.12.2005 |
| 119 | KONYA METROPOLITAN MUNICIPALITY | PAVEMENT DESIGN AND MENDING IN SELÇUKLU DISTRICT | WORKS | 25.08.2005 | 8.05.2006 |
| 120 | KONYA METROPOLITAN MUNICIPALITY | PAVEMENT AND CYCLE LANE DESIGN ON KONYA RING ROAD | WORKS | 10.10.2005 | 9.10.2006 |
| 121 | REGIONAL DIRECTORATE OF HIGHWAYS | INTERCHANGE CONSTRUCTION ON KONYA-KADINHANI-CİHANBEYLİ INTERSECTION | WORKS | 11.10.2005 | 22.11.2006 |
| 122 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF AKÖREN-BOZKIR ROAD KM: 5+900 – 26+710 | WORKS | 13.10.2005 | 31.12.2011 |
| 123 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE SUPPLY AND TRANSPORT FOR ASPHALT COVERING OF ALTINEKIN KARAKAYA ROAD | WORKS | 15.12.2005 | 30.01.2006 |
| 124 | DIRECTORATE OF KONYA INDUSTRIAL PARK | WATER CONDUCTION LINE AND MANHOLE CONSTRUCTION | WORKS | 2.01.2006 | 15.04.2006 |
| 125 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY AND TRANSPORT | WORKS | 15.03.2006 | |
| 126 | KAPADOKYA GAZ | CONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTURE | WORKS | 11.04.2006 | 31.12.2006 |
| 127 | NETGAZ | CONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTURE | WORKS | 12.04.2006 | 31.12.2006 |
| 128 | KONYA METROPOLITAN MUNICIPALITY | WASTE STORAGE WORKS AT ASLIM LANDFILL | WORKS | 19.04.2006 | 5.05.2008 |
| 129 | KONYA METROPOLITAN MUNICIPALITY | DESIGN OF ALIYA IZZET BEGOVIÇ STREET AND FIRAT STREET | WORKS | 11.05.2006 | 10.10.2006 |
| 130 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT ROAD CONSTRUCTION | WORKS | 16.06.2006 | 31.12.2006 |
| 131 | KONYA WATER WORKS | CONSTRUCTION OF DEDEKORKUT RESERVOIR 15.000 m³ | WORKS | 30.06.2006 | 18.12.2007 |
| 132 | KARATAY MUNICIPALITY | FILLER AND AGGREGATE SUPPLY | SUPPLY | 10.07.2006 | 9.11.2006 |
| 133 | KARAMAN GAZ | CONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTURE | WORKS | 1.04.2007 | 31.12.2007 |
| 134 | KAPADOKYA GAZ | CONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTURE | WORKS | 1.04.2007 | 31.12.2007 |
| 135 | KONYA METROPOLITAN MUNICIPALITY | VARIOUS CONSTRUCTION WORKS | WORKS | 16.04.2007 | 22.10.2007 |
| 136 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP MERAM | WORKS | 20.04.2007 | 22.05.2007 |
| 137 | SELÇUKLU MUNICIPALITY | AGGREGATE AND BASE MATERIAL SUPPLY | SUPPLY | 25.04.2007 | 17.11.2007 |
| 138 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP SELÇUKLU | WORKS | 25.04.2007 | 20.10.2007 |
| 139 | KONYA WATER WORKS | IMPROVEMENT OF MERAM FLOOD PROTECTION CANAL | WORKS | 30.04.2007 | 24.10.2007 |
| 140 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP ALTINEKİN | WORKS | 16.05.2007 | 2.07.2007 |
| 141 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF LAMCI INTERCHANGE ON ÇAKIRLI STREET | WORKS | 21.05.2007 | 27.12.2007 |
| 142 | KONYA PROVINCIAL ADMINISTRATION | AGGREGATE, BASE MATERIAL SUPPLY AND TRANSPORT DAP AKÖREN | WORKS | 21.05.2007 | 2.07.2007 |
| 143 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF KONYA FISH MARKET | WORKS | 21.05.2007 | 9.05.2008 |
| 144 | KONYA METROPOLITAN MUNICIPALITY | EXCAVATION, COVERING AND CONNECTION WORKS ON SEVERAL ROADS | WORKS | 4.06.2007 | 31.12.2007 |
| 145 | KONYA METROPOLITAN MUNICIPALITY | ROAD DESIGN OF HACI CEMİL STREET | WORKS | 4.06.2007 | 21.09.2007 |
| 146 | KARATAY MUNICIPALITY | FILLER AND AGGREGATE SUPPLY | SUPPLY | 8.06.2007 | 26.11.2007 |
| 147 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF KONYA-EREĞLİ ROAD KM: 14+600 – 20+960 | WORKS | 20.06.2007 | 23.10.2009 |
| 148 | KONYA WATER WORKS | STEEL PIPE SUPPLY | SUPPLY | 6.08.2007 | 28.11.2007 |
| 149 | KONYA METROPOLITAN MUNICIPALITY | INTERCHANGE CONSTRUCTION ON RING ROAD-KARAMAN ROAD INTERSECTION | WORKS | 7.08.2007 | 16.04.2008 |
| 150 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF OTOGAR INTERCHANGE | WORKS | 22.10.2007 | 22.01.2008 |
| 151 | KARAMAN GAZ | CONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTURE | WORKS | 3.03.2008 | 29.12.2008 |
| 152 | KAPADOKYA GAZ | CONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTURE | WORKS | 3.03.2008 | 29.12.2008 |
| 153 | REGIONAL DIRECTORATE OF HIGHWAYS | AGGREGATE AND BASE MATERIAL SUPPLY FOR KONYA-KARAPINAR ROAD | WORKS | 9.05.2008 | 5.07.2008 |
| 154 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT ROAD AND PAVEMENT CONSTRUCTION LOT 2 | WORKS | 22.05.2008 | 23.11.2008 |
| 155 | KONYA METROPOLITAN MUNICIPALITY | SCHOOLYARD DESIGN WORKS | WORKS | 30.06.2008 | 3.07.2009 |
| 156 | KONYA METROPOLITAN MUNICIPALITY | MEDICAL WASTE STERILIZATION PLANT | BUILD OPERATE TRANSFER | 22.07.2008 | 31.12.2017 |
| 157 | KONYA METROPOLITAN MUNICIPALITY | WIDENING OF KONYA-ANKARA ROAD | WORKS | 20.08.2008 | 3.07.2009 |
| 158 | DIRECTORATE OF KONYA INDUSTRIAL PARK | ASPHALT WORKS OF MAIN STREETS | WORKS | 29.08.2008 | 8.11.2008 |
| 159 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF BOSNA-HERSEK INTERCHANGE | WORKS | 22.10.2008 | 3.07.2009 |
| 160 | REGIONAL DIRECTORATE OF HIGHWAYS | AGGREGATE SUPPLY FOR CİHANBEYLİ AND ILGIN ROADS | WORKS | 7.11.2008 | 13.12.2008 |
| 161 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF AKŞEHİR-AFYON ROAD KM: 131+000 – 146+200 | WORKS | 19.12.2008 | 8.10.2011 |
| 162 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY AND TRANSPORT | SERVICES | 2.01.2009 | 8.04.2009 |
| 163 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF KONYA-AKŞEHİR ROAD KM: 102+000 – 124+000 | WORKS | 1.04.2009 | 12.12.2011 |
| 164 | KONYA METROPOLITAN MUNICIPALITY | 1ST SECTION BINDER ASPHALT AND BASE LAYER CONSTRUCTION | WORKS | 10.06.2009 | 3.11.2009 |
| 165 | KONYA PROVINCIAL ADMINISTRATION | CONSTRUCTION OF EREĞLİ-ULUKIŞLA ROAD KM: 160+320 – 179+667 | WORKS | 31.07.2009 | 24.09.2011 |
| 166 | KONYA METROPOLITAN MUNICIPALITY | WASTE STORAGE WORKS AT ASLIM LANDFILL LOT 4 | WORKS | 3.08.2009 | 13.07.2011 |
| 167 | SELÇUK UNIVERSITY | INFRASTRUCTURE OF THE CAMPUS | WORKS | 18.09.2009 | 16.01.2011 |
| 168 | SELÇUKLU MUNICIPALITY | ASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2009 | WORKS | 19.02.2010 | 9.05.2012 |
| 169 | KONYA METROPOLITAN MUNICIPALITY | OVERPASS CONSTRUCTION | WORKS | 20.05.2010 | 8.09.2010 |
| 170 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT SUPPLY EX WORKS | WORKS | 3.06.2010 | 2.10.2010 |
| 171 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF URBAN ROADS AND SIDEWALKS | WORKS | 25.06.2010 | 1.12.2011 |
| 172 | DIRECTORATE OF KONYA INDUSTRIAL PARK | ASPHALT WORKS OF MAIN STREETS | WORKS | 5.07.2010 | 23.10.2010 |
| 173 | KARATAY MUNICIPALITY | CONRETE SUPPLY | SUPPLY | 19.08.2010 | 15.12.2010 |
| 174 | REGIONAL DIRECTORATE OF HIGHWAYS | AGGREGATE SUPPLY AND TRANSPORT | WORKS | 13.12.2010 | 22.12.2010 |
| 175 | TEPEKÖY MUNICIPALITY | FUEL, LPG AND MINERAL OIL SUPPLY | SUPPLY | 27.12.2010 | 31.12.2011 |
| 176 | KONYA PROVINCIAL ADMINISTRATION | GRAVEL SUPPLY FOR VILLAGE ROADS | WORKS | 29.12.2010 | 20.08.2011 |
| 177 | STATE WATER WORKS | STONEWALL CONSTRUCTION OF ALİÇAY STREAM | WORKS | 4.01.2011 | 31.12.2011 |
| 178 | BAŞARAKAVAK MUNICIPALITY | FUEL AND MINERAL OIL SUPPLY | SUPPLY | 21.01.2011 | 31.12.2011 |
| 179 | DERBENT MUNICIPALITY | FUEL SUPPLY | SUPPLY | 8.02.2011 | 31.12.2011 |
| 180 | KARATAY MUNICIPALITY | CEMENT SUPPLY | SUPPLY | 9.03.2011 | 22.03.2011 |
| 181 | KARATAY MUNICIPALITY | CONRETE SUPPLY | SUPPLY | 9.03.2011 | 15.04.2011 |
| 182 | PROVINCIAL DIRECTORATE OF ENVIRONMENT | FUEL SUPPLY | SUPPLY | 16.03.2011 | 23.12.2011 |
| 183 | AKŞEHİR MUNICIPALITY | FILLER SUPPLY | SUPPLY | 17.03.2011 | 15.08.2011 |
| 184 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF KONYA-BEYŞEHİR ROAD KM: 11+900 – 18+300 | WORKS | 25.03.2011 | 30.07.2011 |
| 185 | ÇAY MUNICIPALITY | AGGREGATE SUPPLY | SUPPLY | 18.05.2011 | 9.09.2011 |
| 186 | TEPEKÖY MUNICIPALITY | DIESEL SUPPLY | SUPPLY | 27.05.2011 | 31.12.2011 |
| 187 | BAŞARAKAVAK MUNICIPALITY | DIESEL SUPPLY | SUPPLY | 28.05.2011 | 31.12.2011 |
| 188 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT SUPPLY AND PAVEMENT | WORKS | 2.06.2011 | 29.11.2011 |
| 189 | REGIONAL DIRECTORATE OF HIGHWAYS | ASPHALT PAVEMENT WORKS ON KONYA-EREĞLİ ROAD | WORKS | 3.06.2011 | 27.12.2011 |
| 190 | DERBENT MUNICIPALITY | DIESEL SUPPLY 24.000 LITERS | SUPPLY | 20.06.2011 | 31.12.2011 |
| 191 | KARATAY MUNICIPALITY | ASPHALT PAVEMENT | WORKS | 8.07.2011 | 30.11.2011 |
| 192 | REGIONAL DIRECTORATE OF HIGHWAYS | KONYA-AKSARAY ROAD KM: 13+000 – 72+000 ENGINEERING STRUCTURES AND EARTH WORKS | WORKS | 1.08.2011 | 16.11.2013 |
| 193 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF KONYA RING ROAD | WORKS | 12.08.2011 | 6.12.2013 |
| 194 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF URBAN ROADS | WORKS | 19.12.2011 | 17.10.2012 |
| 195 | BAŞARAKAVAK MUNICIPALITY | FUEL, LPG AND MINERAL OIL SUPPLY | SUPPLY | 22.12.2011 | 31.12.2012 |
| 196 | TEPEKÖY MUNICIPALITY | FUEL, LPG AND MINERAL OIL SUPPLY | SUPPLY | 23.12.2011 | 31.12.2012 |
| 197 | DERBENT MUNICIPALITY | FUEL SUPPLY | SUPPLY | 2.01.2012 | 31.12.2012 |
| 198 | REGIONAL DIRECTORATE OF HIGHWAYS | ASPHALT MENDING WORKS AGAINST WINTER CONDITIONS | WORKS | 6.02.2012 | 20.03.2012 |
| 199 | SELÇUKLU MUNICIPALITY | ASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2011 | WORKS | 28.02.2012 | 19.09.2014 |
| 200 | REGIONAL DIRECTORATE OF HIGHWAYS | ASPHALT MENDING WORKS AGAINST WINTER CONDITIONS | WORKS | 15.03.2012 | 2.05.2012 |
| 201 | KONYA METROPOLITAN MUNICIPALITY | ASPHALTIC CONCRETE SUPPLY | WORKS | 24.04.2012 | 20.04.2013 |
| 202 | KONYA METROPOLITAN MUNICIPALITY | HOT MIXTURE ASPHALT SUPPLY AND ROAD MENDING | WORKS | 18.05.2012 | 2.07.2013 |
| 203 | KARATAY MUNICIPALITY | AGGRGATE, BASE MATERIAL AND FILLER SUPPLY | SUPPLY | 24.05.2012 | 25.03.2013 |
| 204 | REGIONAL DIRECTORATE OF HIGHWAYS | AGGREGATE SUPPLY | SUPPLY | 29.06.2012 | 18.08.2012 |
| 205 | KONYA METROPOLITAN MUNICIPALITY | SURFACE TREATMENT OF NEW ROADS | WORKS | 13.07.2012 | 26.09.2013 |
| 206 | KARAPINAR MUNICIPALITY | ROAD CONSTRUCTION | WORKS | 3.09.2012 | 15.11.2012 |
| 207 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF BORSA INTERCHANGE ON KONYA-ADANA RING ROAD | WORKS | 28.09.2012 | 2.01.2013 |
| 208 | REGIONAL DIRECTORATE OF HIGHWAYS | HOT MIXTURE ASPHALT PAVEMENT ON VARIOUS ROADS | WORKS | 30.10.2012 | 22.07.2013 |
| 209 | REGIONAL DIRECTORATE OF HIGHWAYS | SNOW SHOVELLING ON KONYA-SEYDİŞEHİR AND BEYŞEHİR ROADS | SERVICES | 13.12.2012 | 4.04.2013 |
| 210 | TEPEKÖY MUNICIPALITY | FUEL, LPG AND MINERAL OIL SUPPLY | SUPPLY | 25.12.2012 | 31.12.2013 |
| 211 | BAŞARAKAVAK MUNICIPALITY | FUEL SUPPLY | SUPPLY | 25.12.2012 | 31.12.2013 |
| 212 | DERBENT MUNICIPALITY | DIESEL SUPPLY 40.000 LITERS | SUPPLY | 31.12.2012 | 31.12.2013 |
| 213 | PROVINCIAL DIRECTORATE OF ENVIRONMENT | FUEL SUPPLY | SUPPLY | 7.01.2013 | 31.12.2013 |
| 214 | KARATAY MUNICIPALITY | CONCRETE SUPPLY 2013 | SUPPLY | 28.03.2013 | 27.12.2013 |
| 215 | ENERGAZ | CONSTRUCTION OF KARAMAN NATURAL GAS INFRASTRUCTURE 2013 | WORKS | 24.04.2013 | 31.12.2013 |
| 216 | ENERGAZ | CONSTRUCTION OF EREĞLİ NATURAL GAS INFRASTRUCTURE 2013 | WORKS | 24.04.2013 | 15.11.2013 |
| 217 | ENERGAZ | CONSTRUCTION OF KONYA NATURAL GAS INFRASTRUCTURE 2013 | WORKS | 24.04.2013 | 31.03.2014 |
| 218 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF URBAN ROADS LOT 2 | WORKS | 8.05.2013 | 3.12.2013 |
| 219 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF URBAN ROADS LOT 1 | WORKS | 8.05.2013 | 3.12.2013 |
| 220 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT SUPPLY AND PAVEMENT, ROAD RENOVATION | WORKS | 5.06.2013 | 27.12.2015 |
| 221 | ENERGAZ | CONSTRUCTION OF NİĞDE-NEVŞEHİR NATURAL GAS INFRASTRUCTURE 2013 | WORKS | 5.06.2013 | 31.12.2013 |
| 222 | ENERGAZ | CONSTRUCTION OF AKSARAY NATURAL GAS INFRASTRUCTURE 2013 | WORKS | 6.06.2013 | 31.12.2013 |
| 223 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF SELBASAN ROAD | WORKS | 4.07.2013 | 7.01.2014 |
| 224 | REGIONAL DIRECTORATE OF HIGHWAYS | HOT MIXTURE ASPHALT PAVEMENT ON VARIOUS ROADS IN KONYA, BEYŞEHİR, SEYDİŞEHİR, AKSARAY | WORKS | 15.07.2013 | 15.12.2013 |
| 225 | KONYA METROPOLITAN MUNICIPALITY | INTERCHANGE CONSTRUCTION ON ÇEÇENİSTAN STREET | WORKS | 29.08.2013 | 16.09.2015 |
| 226 | TEPEKÖY MUNICIPALITY | FUEL AND LPG SUPPLY | SUPPLY | 25.12.2013 | 31.03.2014 |
| 227 | DERBENT MUNICIPALITY | DIESEL SUPPLY 66.000 LITERS | SUPPLY | 31.12.2013 | 31.12.2014 |
| 228 | KONYA TAX OFFICE | DIESEL SUPPLY 17.000 LITERS | SUPPLY | 10.01.2014 | 31.12.2014 |
| 229 | BAŞARAKAVAK MUNICIPALITY | FUEL SUPPLY | SUPPLY | 16.01.2014 | 31.03.2014 |
| 230 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY FCA KARAÖMERLER QUARRY | WORKS | 7.03.2014 | 7.10.2016 |
| 231 | KARATAY MUNICIPALITY | CONCRETE SUPPLY 2014 | SUPPLY | 10.03.2014 | 30.12.2014 |
| 232 | REGIONAL DIRECTORATE OF HIGHWAYS | KONYA-AKSARAY ROAD KM: 26+000 – 116+000 ENGINEERING STRUCTURES, EARTH AND ASPHALT WORKS | WORKS | 4.04.2014 | 15.12.2016 |
| 233 | DIRECTORATE OF KONYA INDUSTRIAL PARK | CONCRETE SUPPLY FOR EXTENSION AREA SURROUNDING WALL | SUPPLY | 11.06.2014 | 21.12.2015 |
| 234 | KONYA METROPOLITAN MUNICIPALITY | STRUCTUAL STEEL AND CONCRETE SUPPLY | SUPPLY | 7.08.2014 | 4.01.2015 |
| 235 | TEİAŞ | ENVIRONMENTAL DESING, DRAINAGE AND ASPHALT PAVEMENT WORKS | WORKS | 15.08.2014 | 26.09.2014 |
| 236 | KONYA ŞEKER | COAL STRIPPING | WORKS | 18.08.2014 | ONGOING |
| 237 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF YENİ SİLLE STREET | WORKS | 22.08.2014 | 10.06.2015 |
| 238 | SELÇUKLU MUNICIPALITY | ASPHALT AND BASE MATERIAL SUPPLY, TRANSPORT AND APPLICATION | WORKS | 14.10.2014 | 24.11.2014 |
| 239 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT SUPPLY EX WORKS | WORKS | 21.11.2014 | 29.05.2015 |
| 240 | SELÇUKLU MUNICIPALITY | ASPHALT PRODUCTION, PAVEMENT AND PATCH WORKS 2014 | WORKS | 21.11.2014 | 3.01.2018 |
| 241 | KONYA METROPOLITAN MUNICIPALITY | CONCRETE AND PORTLAND CEMENT SUPPLY | SUPPLY | 5.12.2014 | 15.12.2017 |
| 242 | KONYA TAX OFFICE | FUEL SUPPLY | SUPPLY | 19.12.2014 | 31.12.2015 |
| 243 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF GÜNEYSINIR MAIN STREET | WORKS | 29.12.2014 | 29.06.2016 |
| 244 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF EMİRGAZİ MAIN STREET | WORKS | 5.01.2015 | 22.12.2015 |
| 245 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF DERBENT MAIN STREET | WORKS | 5.01.2015 | 24.06.2016 |
| 246 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF ÇUMRA MAIN STREET | WORKS | 5.01.2015 | 5.10.2016 |
| 247 | KONYA METROPOLITAN MUNICIPALITY | CONCRETE ELEMENTS AND BASE MATERIAL SUPPLY | SUPPLY | 5.01.2015 | 1.12.2016 |
| 248 | DERBENT MUNICIPALITY | DIESEL SUPPLY 55.000 LITERS | SUPPLY | 15.01.2015 | 5.01.2016 |
| 249 | KONYA METROPOLITAN MUNICIPALITY | WASTE STORAGE WORKS AT ASLIM LANDFILL LOT 7 | WORKS | 20.03.2015 | 22.03.2016 |
| 250 | KARATAY MUNICIPALITY | CONCRETE SUPPLY 2015 | SUPPLY | 6.05.2015 | 30.12.2015 |
| 251 | AIR DEFENCE COMMAND | ASPHALT PATCH WORKS | WORKS | 4.06.2015 | 3.07.2015 |
| 252 | KONYA METROPOLITAN MUNICIPALITY | STRUCTUAL STEEL AND CONCRETE SUPPLY | SUPPLY | 23.06.2015 | 23.07.2017 |
| 253 | KONYA METROPOLITAN MUNICIPALITY | REINFORCED CONCRETE WORKS IN EMİRGAZİ, DERBENT AND GÜNEYSINIR DISTRICTS | WORKS | 31.07.2015 | 7.12.2015 |
| 254 | KONYA METROPOLITAN MUNICIPALITY | RENOVATION OF URBAN ROADS | WORKS | 31.07.2015 | 20.07.2018 |
| 255 | KARATAY MUNICIPALITY | DRAINAGE PIPELINE INSTALLATION ON KANAL STREET | WORKS | 28.09.2015 | 20.01.2016 |
| 256 | KONYA METROPOLITAN MUNICIPALITY | STRUCTUAL STEEL AND CONCRETE SUPPLY, TRANSPORT AND PLACING | SUPPLY | 13.10.2015 | 16.09.2018 |
| 257 | DERBENT MUNICIPALITY | FUEL SUPPLY | SUPPLY | 15.01.2016 | 31.12.2016 |
| 258 | KARATAY MUNICIPALITY | CONCRETE SUPPLY 2016 | SUPPLY | 6.04.2016 | 19.12.2016 |
| 259 | KONYA WATER WORKS | CONSTRUCTION OF WATER RESEVOIRS 2016 LOT 1 | WORKS | 6.04.2016 | 23.04.2017 |
| 260 | SELÇUKLU MUNICIPALITY | CONCRETE SUPPLY | SUPPLY | 22.04.2016 | 22.12.2016 |
| 261 | KONYA METROPOLITAN MUNICIPALITY | ASPHALT SUPPLY EX WORKS | WORKS | 22.04.2016 | 19.09.2017 |
| 262 | KARATAY MUNICIPALITY | ASPHALT PATCH WORKS | SERVICES | 28.04.2016 | 17.11.2016 |
| 263 | MERAM MUNICIPALITY | AGGREGATE AND FILLER SUPPLY AND TRANSPORT | SUPPLY | 5.05.2016 | 9.09.2016 |
| 264 | KONYA WATER WORKS | SUBBASE MATERIAL AND FILLER SUPPLY | SUPPLY | 24.05.2016 | 23.08.2016 |
| 265 | KONYA METROPOLITAN MUNICIPALITY | AKŞEHİR LANDFILL GAS POWER PLANT | BUILD OPERATE TRANSFER | 13.06.2016 | ONGOING |
| 266 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF WASTE SORTING PLANT | WORKS | 19.09.2016 | 3.01.2018 |
| 267 | REGIONAL DIRECTORATE OF HIGHWAYS | CONSTRUCTION OF SEYDİŞEHİR-BOZKIR ROAD KM: 0+000 – 6+000 | WORKS | 19.09.2016 | 30.09.2017 |
| 268 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCION OF MERAM UNDERGROUND PARKING GARAGE | WORKS | 24.10.2016 | 5.11.2019 |
| 269 | ERZURUM METROPOLITAN MUNICIPALITY | ERZURUM LANDFILL GAS POWER PLANT | BUILD OPERATE TRANSFER | 27.10.2016 | ONGOING |
| 270 | KONYA METROPOLITAN MUNICIPALITY | AGGREGATE SUPPLY FCA KARAÖMERLER QUARRY | WORKS | 28.11.2016 | 23.11.2018 |
| 271 | KONYA TAX OFFICE | FUEL SUPPLY | SUPPLY | 7.12.2016 | 7.12.2017 |
| 272 | SELÇUKLU MUNICIPALITY | CONCRETE SUPPLY | SUPPLY | 16.12.2016 | 27.01.2017 |
| 273 | AKŞEHİR MUNICIPALITY | CONSTRUCTION OF DUDU KADIN BAZAAR | WORKS | 21.12.2016 | 16.10.2019 |
| 274 | DERBENT MUNICIPALITY | FUEL SUPPLY | SUPPLY | 30.12.2016 | 30.12.2017 |
| 275 | KONYA METROPOLITAN MUNICIPALITY | KONYA WASTE TO ENERGY PLANT | BUILD OPERATE TRANSFER | 1.02.2017 | ONGOING |
| 276 | KONYA METROPOLITAN MUNICIPALITY | ROAD AND PAVEMENT CONSTRUCTION | WORKS | 17.02.2017 | 12.04.2018 |
| 277 | MERAM MUNICIPALITY | ASPHALT PRODUCTION AND PAVEMENT WORKS | WORKS | 10.04.2017 | 27.06.2019 |
| 278 | MERAM MUNICIPALITY | CONCRETE SUPPLY | SUPPLY | 17.04.2017 | 11.02.2018 |
| 279 | AKSARAY MUNICIPALITY | ATATÜRK BULVARI EFOR AVM FRONT BRIDGE INTERCHANGE CONSTRUCTION WORK | WORKS | 24.05.2017 | 2.05.2018 |
| 280 | MERAM MUNICIPALITY | WASHED SURFACE COATING GROUND, 0-5 MM FILLER MATERIAL SUPPLY AND TRANSPORT | SUPPLY | 26.05.2017 | 9.10.2017 |
| 281 | KONYA METROPOLITAN MUNICIPALITY | MAKING AESTHETIC ARRANGEMENTS ON STREETS AND SQUARE | WORKS | 11.10.2017 | 15.10.2019 |
| 282 | KONYA METROPOLITAN MUNICIPALITY | COATING ON CITY ROADS | WORKS | 15.11.2017 | 5.11.2017 |
| 283 | KONYA TAX OFFICE | LIQUID FUEL | SUPPLY | 5.12.2017 | 31.12.2018 |
| 284 | DIRECTORATE OF KONYA INDUSTRIAL PARK | KONYA ORGANIZED INDUSTRIAL ZONE 5TH PART EXPANSION AREA WASTEWATER NETWORK, STORM WATER NETWORK AND ROAD INFRASTRUCTURE WORKS | WORKS | 6.12.2017 | 30.12.2020 |
| 285 | DERBENT MUNICIPALITY | PURCHASE OF FUEL GOODS | SUPPLY | 29.12.2017 | 31.12.2018 |
| 286 | KONYA METROPOLITAN MUNICIPALITY | ARRANGEMENT OF KONYA CITY ROADS | WORKS | 29.12.2017 | 17.10.2022 |
| 287 | KONYA TAX OFFICE | LIQUID FUEL SUPPLY | SUPPLY | 28.11.2018 | 31.12.2019 |
| 288 | DIRECTORATE OF KONYA INDUSTRIAL PARK | RAINWATER DISCHARGE CHANNEL CONSTRUCTION WORK | WORKS | 12.09.2019 | 12.10.2020 |
| 289 | DIRECTORATE OF KONYA INDUSTRIAL PARK | WASTEWATER AND RAINWATER PUMPING CENTER CONSTRUCTION WORK FOR PART 2, 3 AND 4 | WORKS | 24.10.2019 | 4.07.2022 |
| 290 | DERBENT MUNICIPALITY | LIQUID FUEL SUPPLY | SUPPLY | 20.11.2019 | 31.12.2020 |
| 291 | ASELSAN KONYA WEAPON SYSTEMS INC. | ASELSAN KONYA EXCAVATION, FILLING, INFRASTRUCTURE AND LANDSCAPING WORKS | WORKS | 17.12.2019 | 20.05.2021 |
| 292 | MERAM MUNICIPALITY | CRUSHED STONE SUPPLY | SUPPLY | 15.04.2020 | 22.12.2020 |
| 293 | DIRECTORATE OF KONYA INDUSTRIAL PARK | PART 5 NATURAL GAS INFRASTRUCTURE WORK | WORKS | 27.07.2020 | 14.08.2021 |
| 294 | KARATAY MUNICIPALITY | LAYING AND COMPRESSION OF HOT ASPHALT MATERIAL | SERVICES | 12.08.2020 | 10.11.2020 |
| 295 | DERBENT MUNICIPALITY | PURCHASE OF FUEL GOODS | SUPPLY | 20.10.2020 | 31.12.2021 |
| 296 | KONYA METROPOLITAN MUNICIPALITY | URBAN RENOVATION PROJECT IN FRONT OF THE TURBE | WORKS | 15.12.2020 | 5.08.2022 |
| 297 | MINISTRY OF YOUTH AND SPORTS | KONYA VELEDROM CONSTRUCTION WORK | WORKS | 14.01.2021 | 1.07.2022 |
| 298 | DERBENT MUNICIPALITY | FUEL AND GOODS SUPPLY | SUPPLY | 8.12.2021 | 31.12.2022 |
| 299 | MERAM MUNICIPALITY | 0-25 MM AGGREGATE SUPPLY AND TRANSPORT | SUPPLY | 30.03.2022 | 19.12.2022 |
| 300 | DIRECTORATE OF KONYA INDUSTRIAL PARK | 5. PART NO. 2 PUMPING CENTER SUPPLY CONSTRUCTION WORK | WORKS | 6.07.2022 | ONGOING |
| 301 | MERAM MUNICIPALITY | MERAM YAKA SOCIAL FACILITY CONSTRUCTION | WORKS | 7.07.2022 | ONGOING |
| 302 | KONYA METROPOLITAN MUNICIPALITY | CONCRETE SUPPLY | SUPPLY | 17.08.2022 | 15.12.2022 |
| 303 | KONYA METROPOLITAN MUNICIPALITY | KÜÇÜKKOVANAGZI TAŞKÖPRÜ AVENUE BRIDGE INTERCHANGE CONSTRUCTION | WORKS | 10.02.2023 | ONGOING |
| 304 | KONYA METROPOLITAN MUNICIPALITY | CONSTRUCTION OF SEDIRLER BRIDGE INTERCHANGE | WORKS | 17.02.2023 | ONGOING |